TWiki > DNA > LinkHint > LinkHintIssue004 TWiki webs:
Main | TWiki | Know | Sandbox
DNA . { History of Changes | DNA Documents | Search | Go }

Back to DNA Link-Information Document Issue Tracker

* Added 8/Mar/2005 *

" The changes on the underlying link-layer status can be relayed to IP in the form of link-layer event notifications. Establishment and tear down of a link-layer connection are two basic events types."

[BA] I think you are referring to explicit messages resulting in establishment (e.g. PPP IPCP) or teardown (PPP LCP-terminate) of the link-layer. However, in wireless technologies the mobile node can wander out of range or suffer from high frame loss for other reasons; in these cases there can be links in intermediate states between "up" (low loss) and "down" (high loss). The distinction between link establishment/teardown events and the link state is an important one.

--

-- Main.GregDaley - 09 Mar 2005

Back to DNA Issue Tracker Base Page

Topic LinkHintIssue004 . { Edit | Attach | Ref-By | Printable | Diffs | r1.1 | More }
Revision r1.1 - 09 Mar 2005 - 05:33 GMT - Main.GregDaley
Parents: WebHome > LinkHint
Copyright © 1999-2003 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback.